From split-levels near the Town Center to acreage decks out past Carver and Damascus, Clackamas decks take a lot of wet weather. We tear out the rot, rebuild the base, and finish with a fully waterproof surface installed by our own crew.
Most of the homes around Sunnyside, Sunnybrook and the slopes of Mount Scott went up between the 1970s and the 2000s. Many have a raised deck off the kitchen or an upper deck that covers a patio below. Head east toward Carver and Damascus and the lots open up into acreage, with big decks, wraparound porches and covered entries that face open fields and wind.
Those eastern hills also pull more rain out of the clouds than the flats near the mall. Decks out there stay wet longer, and coatings that might last a while in town give out sooner.
We are roughly 30 minutes south of our Vancouver shop on I-205, so Clackamas is an easy run for estimates and installs. Our in-house crew handles every step and finishes each deck with Westcoat ALX Pro, a waterproof walking surface with a Class A fire rating.
Inside the coating
Inside your new Clackamas deck
Not paint, not a sealer. A bonded, layered system built over plywood or concrete.
For decks, balconies & concrete
Westcoat ALX Pro deck system
Plywood or concreteFailing surfaces removed, framing repaired and new plywood installed where needed. ALX Pro also goes over concrete.
Sheet membraneApplied over every plywood seam.
Reinforcing lathFastened across the deck to anchor the system.
Base coatPolymer-modified cement troweled into the lath.
Slurry and texture coatsBuild the walking surface and the decorative finish.
Acrylic topcoatTwo coats seal the finished surface. Class A fire rated system.
Water under the deck? Here is what it usually means
A leak rarely starts where you notice it. On a Clackamas deck over a patio, you might first see a stain on the patio ceiling or paint that has started to bubble. On a deck by the kitchen, it may be a wet subfloor at the sliding door. Either way, the plywood up top has likely been taking on water for a while.
Warning signs worth a call
Spots that give a little or bounce when you step on them
Coating that is cracking, flaking or lifting in blisters
Brown marks or bubbling paint on the ceiling below
Water working in around the door to the deck
Plywood that looks dark or rotten along the outside edge
A surface that stays damp long after a storm moves through
Patches on top of older patches
Drips or damp spots in the garage or room underneath
We track the water back to its source, pull the failed surface, replace wet or rotted sheets, fix damaged joists, and then waterproof the whole deck. Sealing just the visible spot almost always lets the leak find a new path.
Rot repair comes first
You cannot paint your way out of rot. On acreage decks that sit low to the ground, the damage often starts at the ledger and the posts. On subdivision decks, it tends to start at the door threshold and the outer edge, where water runs off.
We remove the surface, check the plywood sheet by sheet, and replace anything soft or rotted. Damaged joists are repaired. Once the framing is sound, the full ALX Pro system goes over the new wood and keeps it dry.
These eight photos follow one of our balcony restorations from start to finish. A Sunnybrook deck or a big porch out in Damascus gets the same process.
Step 1: Check the old surfaceWe look for soft areas, cracks, active leaks and open seams.Step 2: Strip itThe failed surface is removed so the plywood and framing can be seen.Step 3: Fix the framingJoists and framing with water damage are repaired.Step 4: New plywoodSoft or rotted sheets are replaced with fresh plywood.Step 5: Seam membrane and lathEvery plywood seam gets sheet membrane, and reinforcing lath is fastened across the full deck.Step 6: Base coat and membraneA cement base coat is troweled into the lath, then the fiberlath-reinforced waterproof membrane goes on.Step 7: Texture coatsSlurry and texture coats form the walking surface, the decorative finish and the slip resistance.Step 8: TopcoatTwo coats of acrylic topcoat seal the whole system, and the deck can go back to work as a waterproof, Class A fire-rated surface.
Upper decks and balconies over finished rooms
Plenty of Clackamas two-stories have a deck that doubles as the roof over a family room, a garage or a covered patio. An open deck lets rain drop through the gaps. A deck like this cannot. Every bit of water has to shed off the top, so the surface, seams, edges and threshold all have to be watertight.
ALX Pro bonds over the plywood as one continuous waterproof membrane, and it is Class A fire rated, which matters when the deck is tied into the house. Learn more about balcony waterproofing and decks over living space.
Choose a finish that suits the house
A new surface also means a new look. You can keep it simple with a clean concrete finish, or choose a plank or paver pattern for a big rural deck or front porch. Light finishes stay cooler on south-facing decks, and darker ones hide dirt on farm properties. Tell us what you have in mind and we will design it with you.
What ALX Pro gives a Clackamas deck
As a Westcoat Qualified Contractor Applicator, we install one system and know it well:
Class A fire rated as part of a one-hour fire-rated assembly
Wildland Urban Interface (WUI) compliant under IAPMO ER-587, a plus for homes near open land and trees
Fully waterproof: a lasting walking surface that keeps water out of the structure underneath
Skid-resistant finish with a UV-resistant topcoat
Plywood or concrete: decks, balconies, landings, porches, stairs, entry steps and patios
Design choices: a clean concrete look, or plank and paver patterns, light or dark
Little upkeep: Westcoat recommends resealing the topcoat every 3 to 5 years
Up to a 20-year Westcoat manufacturer warranty, depending on system and surface
Railing, rebuilds and the rest of the house
New railing
We install cable, glass and black aluminum picket railing, plus porch and stair rails. Adding railing while the deck is already open lets us plan the posts with the waterproofing. Visit our Clackamas railing page or see your railing price in 90 seconds. Glass is priced for your space, so we contact you for that.
A new deck or a full rebuild
When the framing on an old acreage deck is too far gone, Tim can run a rebuild as the general contractor. The framing is done under him, then our crew adds the waterproof surface and the railing, so the whole project stays with one team.
The people who come out to measure are the people who do the work. We do not pass the coating off to another outfit. Rain is part of life in Clackamas County, so we build a tarp tent over the deck and keep going through the wet months. We only stop when it is colder than the manufacturer's minimum.
Your ALX Pro deck comes with up to a 20-year Westcoat warranty, in writing, depending on the system and what it is installed over. Westcoat recommends a topcoat reseal every 3 to 5 years to keep it protected.
Clackamas areas we serve
We repair and waterproof decks, balconies, porches and landings in Sunnyside, Sunnybrook, Mount Scott, the Clackamas Town Center area, Carver and Damascus.
A look at real 360 Surfaces decks, railings and steps. Click any photo for a bigger view.
Questions from Clackamas homeowners
We are out past Carver with a big wraparound deck. Do you come that far?
Yes. Carver, Damascus and the acreage around them are part of our regular Clackamas area. Large rural decks and porches get the same repair and ALX Pro process as any other deck.
Our Sunnyside deck sits over the patio, and the patio ceiling has stains. Can you stop it?
Yes. We remove the failing surface, replace wet or rotted plywood, repair joists as needed, and install a fully waterproof walking surface so water stops reaching the ceiling below.
It rains more up in Damascus. Does that affect the install?
Not much. A tarp tent goes over the deck when it rains, and we keep installing through every season. We only hold off when it drops below the temperature the manufacturer allows.
Is it worth patching just the soft spot?
Usually not. One soft spot tends to mean more damage close by. We look over the whole deck at the estimate and give you a straight answer.
Can the concrete front steps match the deck?
Yes. ALX Pro can go over concrete entry steps, porches and patios, so the entry can match the deck.
Is ALX Pro fire rated?
Yes. It is a Class A fire-rated system with a one-hour fire-rated assembly, and it meets WUI requirements under IAPMO ER-587.